Case study summary
Cestoil CDR2081: Crude pipeline throughput
Cestoil CDR2081 helped a crude-pipeline operator evaluate greater delivery capacity using existing pumps and pipeline infrastructure.
Request Full Case StudyThe challenge
The operator wanted to increase port-to-refinery delivery while working within the pipeline’s pressure limit and existing pumping configuration.
Treatment and technical service
Cestoil and the operator agreed trial settings, checked injection equipment and monitored chemical feed, flow, outlet pressure and valve position. Performance was evaluated after the line filled with treated crude.
Reported outcome
21.7% reported gain in daily-equivalent capacity
The operator reported a 21.7% increase in daily-equivalent delivery capacity, with lower measured outlet pressure. The capacity figure is an estimate rather than a measured 24-hour total. Full operating conditions and the separate flow and pressure comparison bases are provided in the detailed report.
Discuss the evidence for your application
Request the full technical case study for a closer review of the trial, supporting data and operating context. Our team will review your company and intended application before releasing the report.
Request Full Case StudyFull reports are provided following review and subject to availability.