The challenge

The operator wanted to increase port-to-refinery delivery while working within the pipeline’s pressure limit and existing pumping configuration.

Treatment and technical service

Cestoil and the operator agreed trial settings, checked injection equipment and monitored chemical feed, flow, outlet pressure and valve position. Performance was evaluated after the line filled with treated crude.

Reported outcome

21.7% reported gain in daily-equivalent capacity

The operator reported a 21.7% increase in daily-equivalent delivery capacity, with lower measured outlet pressure. The capacity figure is an estimate rather than a measured 24-hour total. Full operating conditions and the separate flow and pressure comparison bases are provided in the detailed report.

Discuss the evidence for your application

Request the full technical case study for a closer review of the trial, supporting data and operating context. Our team will review your company and intended application before releasing the report.

Request Full Case Study

Full reports are provided following review and subject to availability.

Explore Pipeline & Terminal Solutions · Todos os estudos de caso