炼油工艺解决方案· 案例研究
Northshore CC827495: Crude calcium removal at a lower dose ratio
A refinery evaluated Northshore CC827495 on a high-calcium crude in its existing electrostatic desalter. Seven paired samples showed 70.8–76.3% calcium removal, averaging 73%, at an applied ratio below the technical agreement’s range.
索取完整案例研究运行背景与试验目标
A refinery introduced a crude containing 11.5–12.8 mg/kg calcium to an atmospheric–vacuum unit. The plant wanted to remove the calcium in its existing electrostatic desalter, without adding equipment or changing the desalting duty. The technical agreement for the decalcification program provided for a chemical dose of 3.5–5 times the calcium content of the crude.
Organically bound calcium does not transfer to wash water by simple partitioning. A decalcifier converts it to a water-soluble salt within the desalter residence time so that the calcium can leave with the brine rather than continue to the preheat train, furnace and FCC unit.
产品应用与监测方式
Northshore CC827495 was metered through the existing metal-removal injection facility into the wash-water line ahead of the second-stage desalter vessel. Treatment began on 21 May 2020 at 30 ppm on crude, about 2.5 times the seven-sample mean feed calcium.
Operating conditions were left as found: desalter temperature 125–135 °C, interface 30–50%, wash water at pH 9 with staged brine recycle, and mixing-valve pressure drop of 35–60 kPa. From 9 to 30 June, the plant laboratory collected seven paired inlet and outlet crude samples and analysed calcium in both.
报告的试验结果
Calcium removal was consistent across all seven sample pairs. Removal ranged from 70.8% to 76.3% and averaged 73%. Feed calcium of 11.5–12.8 mg/kg was reduced to 2.8–3.7 mg/kg; no sample fell below 70% removal.
Calcium removal across seven paired samples
The result was achieved below the agreement’s dose-ratio range. The report’s data section states the ratio as 2× and its conclusion as 2.5×. Using 30 ppm and the seven-sample mean feed calcium of 12.1 mg/kg gives approximately 2.5×; the webpage and summary PDF use that calculated ratio and preserve the discrepancy in the detailed account.
| Measure | Reported value |
|---|---|
| Crude rate | 370–380 t/h, about 21% above the agreement’s 310 t/h basis |
| Wash water | 11–13 t/h per stage, below the contracted 14–16 t/h |
| Desalted-crude salt | 1.1–2.6 mg/L, averaging 1.82 mg/L |
| Reported side effects | None on unit operation, corrosion control, product properties or downstream units |
The customer recorded steady desalting during the trial. The report does not provide a pre-trial salt baseline, so the salt result describes conditions during treatment rather than a before-and-after improvement.
运行价值
The source report presents the result in process terms and provides no monetary figure. Under the reported conditions, the program reduced the average calcium leaving the desalter to 3.3 mg/kg, compared with an average 12.1 mg/kg in the feed, while using the existing injection point and operating at an elevated crude rate.
For another refinery, an economic review can connect calcium removal with desalter stability, furnace and heat-exchanger fouling, and FCC catalyst condition. Those are evaluation inputs; this trial report does not quantify savings in those areas.
如何应用试验结果
Use paired inlet and outlet samples to evaluate calcium removal, and record crude calcium, chemical dose, wash-water rate, interface, temperature and mixing-valve pressure drop with each sample. Express the chemical rate both in ppm on crude and as a ratio to measured feed calcium so the treatment can be compared across crude slates.
Establish a pre-trial salt baseline when desalting performance is part of the evaluation. This case confirms the salt level observed during treatment, but the missing baseline prevents a direct claim about improvement.
探讨类似应用
Request the full illustrated case study and share your crude-calcium range, desalter configuration and current treatment ratio. Cestoil can review the application and propose a paired-sampling plan for your crude.
索取完整案例研究Company details and intended use are reviewed before the detailed PDF is released. For application support, 联系我们的技术团队.
Source: Customer trial report from the participating refinery, May–June 2020, as summarized in Cestoil case study CS-CDU-CC827495-2026A, v1.0. All operating figures are reported by the customer. Performance reflects the specific trial conditions and may vary with feed quality and operating conditions.